Sea Freight from Guangzhou to Southampton
By David Fan, Owner of UpFreights. Updated 14 November 2026.
Quick answer
- Cost
- From $1,650 for a 40-foot container with MSC, port to port.
- Time
- 42-44 days port to port.
- Route
- Direct sailings from China call at Southampton, by Suez or round Africa.
- Customs
- Duty, tax and the papers you need are in our China to United Kingdom guide.
These rates are from an earlier rate sheet and are shown as a guide. Freight prices change often, so ask us for today's rate.
Transit
42-44 days
Shortest sea route
9,620 nautical miles
Pricing
Container Options & Pricing
Rates by shipping line from our own rate sheet, port to port, for a full container.
| Carrier | 20GP (USD) | 40GP (USD) | 40HQ (USD) | Transit Time |
|---|---|---|---|---|
| MSC | — | $1,650 | $1,650 | 42 days |
| Maersk | $2,115 | $3,250 | $3,250 | 44 days |
These rates are from an earlier rate sheet and are shown as a guide. Freight prices change often, so ask us for today's rate.
The journey
How a container gets from Guangzhou to Southampton
Southampton is on the Asia to Europe main line: DP World lists direct services to major Asian ports. From the quay, 22 trains a day run inland, so many containers go on by rail.
By sea, Guangzhou to Southampton is about 9,620 nautical miles through the Suez Canal, or 12,960 round the Cape of Good Hope.
Distance by sea
- By the Suez Canal
- 9,620 nautical miles
- about 17,820 km
- By the Cape of Good Hope
- 12,960 nautical miles
- about 24,000 km
The route round Africa is about 3,340 nautical miles longer. Lines switch between the two, so ask us which one the sailing we quote takes.
Port to port, worked out by us with open-source routing software.
Where it arrives
Port of Southampton, Southampton Container Terminals
Run by DP World Southampton (in the port run by Associated British Ports)
| Containers in 2025 | More than 2 million TEU |
|---|---|
| Berths and depth | 5 berths on 1,920 metres of quay, 16 metres deep |
| Largest ships | New cranes can work ships of 24,000 TEU |
| Rail | 22 trains a day inland, including 6 a day to the Birmingham area and 5 to Manchester |
| Truck turnaround | 35 minutes on average over the last 12 months |
TEU is the standard count for containers. One 40-foot container is 2 TEU.
All figures are DP World Southampton's own.
From the port to your warehouse
Most containers finish the trip by truck. These are the road distances from Southampton Container Terminals.
Bristol
167 km (104 miles) by road
Birmingham
234 km (145 miles) by road
Manchester
362 km (225 miles) by road
Leeds
383 km (238 miles) by road
Worked out by us with OpenStreetMap routing. Truck journey times depend on traffic and driving-hour rules, so ask us for a delivery date.
A worked example
What one 40-foot container costs on this route, line by line
We took the lowest 40-foot rate in the table above ($1,650 with MSC) and did the sums.
Freight per cubic metre
about $24 per cubic metre
$1,650 divided by the 67.7 cubic metres a standard 40-foot container holds is $24.37, if the container is full. Half full, each cubic metre costs twice that.
Duty and tax on arrival
Example: one container of cotton bed linen (tariff code 6302 31 00 00) that you paid $30,000 for.
Cotton bed linen pays 12% UK duty, so duty costs more than the freight here.
| Goods | $30,000 |
| Sea freight | $1,650 |
| Value for customs | $31,650 |
| Duty at 12% | $3,798 |
| UK import VAT at 20% | $7,090 |
| Goods, freight, duty and tax | $42,538 |
Duty is charged on goods plus freight, and tax on that plus the duty. VAT-registered businesses can usually reclaim import VAT. Not included: insurance, port handling, broker fees and delivery. Rates from the official tariff, November 2026.
Compare
Nearby routes and their prices
The lowest 40-foot rate and the days for each route, from the same rate sheet as the table above.
From Guangzhou to other ports in United Kingdom
The general guides
This page covers only what is particular to Guangzhou to Southampton. The parts that are the same on every route have their own pages.
- Shipping from China to the United Kingdom: customs, duty and tax
- Sea freight: container sizes and how a shipment works
- CBM calculator: work out your shipment volume
- How many CBM fit in a 40 ft container
- Customs clearance: the documents you need
- Shipping terms (Incoterms): who pays for what
- Door-to-door delivery
Where these facts come from
Prices and transit days are from our own rate sheet. Everything else on this page was checked against these sources in November 2026. Page by David Fan, Owner of UpFreights.
- LONDON GATEWAY CONTAINER VOLUMES UP MORE THAN 50% TO SET NEW ANNUAL RECORD
- Logistics Infrastructure & Facts At Southampton Port | DP World
- FOUR OF EUROPE’S LARGEST QUAY CRANES ARRIVE AT DP WORLD’S UK PORTS
- Hapag-Lloyd container specification, 40-foot standard (67.7 cubic metres)
- Sea distance worked out by UpFreights with the open-source searoute tool
- UK Integrated Online Tariff, commodity 6302310000
- GOV.UK, VAT rates
- Road distances worked out by UpFreights with OpenStreetMap routing (OSRM)
FAQs
Frequently Asked Questions
How much does a 40-foot container cost from Guangzhou to Southampton?
Our rate sheet shows 40-foot rates from $1,650 (MSC) to $3,250, port to port, across 2 shipping lines. These rates are from an earlier rate sheet and are shown as a guide. Freight prices change often, so ask us for today's rate.
How long does sea freight take from Guangzhou to Southampton?
42-44 days port to port, by the transit days on our rate sheet. Add time for customs and for delivery from the port.
How many nautical miles is Guangzhou to Southampton by sea?
About 9,620 nautical miles through the Suez Canal, or about 12,960 round the Cape of Good Hope. We worked these out port to port with open-source routing software.
Can a container go from Guangzhou to Southampton on one ship?
Yes, on the lines that sail direct. DP World says direct services link Southampton with major ports across Asia. Ask us whether the sailing we quote is direct.
Can my container go from Southampton to the Midlands by train?
Yes. DP World says three rail operators run 22 trains a day from the terminal, including six a day to the Birmingham area and five a day to Manchester.
How long does sea freight take from China to the United Kingdom?
Across the 42 China to the United Kingdom port pairs on our rate sheet, port-to-port transit runs from 32 to 45 days. Guangzhou to Southampton is 42-44 days. Add time for customs and delivery.
How much does it cost to ship a 40-foot container from China to the United Kingdom?
Across those 42 port pairs, our rate sheet shows 40-foot rates from $1,650 to $3,550, port to port, before duty, tax and local charges. These rates are from an earlier rate sheet and are shown as a guide. Freight prices change often, so ask us for today's rate.
Get Your Sea Freight Quote
Ready to ship from Guangzhou to Southampton? Get a competitive quote for your cargo. Our team will respond within 24 hours.
routes
guides
response