Sea Freight from Guangzhou to Charleston
By David Fan, Owner of UpFreights. Updated 14 November 2026.
Quick answer
- Cost
- Quoted for your dates. Our rate sheet has no price for this pair yet. Nearest on the sheet: Guangzhou to Atlanta from $4,400.
- Distance
- About 11,030 nautical miles by the Panama Canal.
- Route
- Across the Pacific and through the Panama Canal.
- Customs
- Duty, tax and the papers you need are in our China to United States guide.
These rates are from an earlier rate sheet and are shown as a guide. Freight prices change often, so ask us for today's rate.
Shortest sea route
11,030 nautical miles
The journey
How a container gets from Guangzhou to Charleston
An all-water service from Guangzhou to Charleston crosses the Pacific and passes through the Panama Canal, about 11,030 nautical miles.
Ships from China call at Charleston directly. SC Ports' main terminal, Wando Welch, can work ships of up to 20,000 TEU, and the newer Leatherman Terminal opened in 2021.
Distance by sea
- By the Panama Canal
- 11,030 nautical miles
- about 20,430 km
Measured port to port through the Panama Canal. Of the 3 Chinese ports on our list for Charleston, Guangzhou is the furthest by sea.
Port to port, worked out by us with open-source routing software.
Where it arrives
Port of Charleston (SC Ports)
Run by South Carolina Ports Authority
| Containers in 2025 | 2,565,297 TEU |
|---|---|
| Main terminal | Wando Welch, about 80% of volume, ships up to 20,000 TEU |
| Harbour depth | 52 feet to the container terminals |
| Leatherman Terminal | Opened 2021, 700,000 TEU first-phase capacity |
| Asia services | 11 a week (September 2025) |
| Rail | CSX and Norfolk Southern; imports moved to rail within 24 hours |
TEU is the standard count for containers. One 40-foot container is 2 TEU.
All figures are SC Ports' own.
From the port to your warehouse
Most containers finish the trip by truck. These are the road distances from Wando Welch Terminal, Charleston.
Columbia
189 km (117 miles) by road
Charlotte
337 km (209 miles) by road
Greenville
347 km (216 miles) by road
Atlanta
488 km (303 miles) by road
Worked out by us with OpenStreetMap routing. Truck journey times depend on traffic and driving-hour rules, so ask us for a delivery date.
Compare
Nearby routes and their prices
The lowest 40-foot rate and the days for each route, from our rate sheet.
From Guangzhou to other ports in United States
Into Charleston from other ports in China
The general guides
This page covers only what is particular to Guangzhou to Charleston. The parts that are the same on every route have their own pages.
- Shipping from China to the United States: customs, duty and tax
- Sea freight: container sizes and how a shipment works
- CBM calculator: work out your shipment volume
- How many CBM fit in a 40 ft container
- Customs clearance: the documents you need
- Shipping terms (Incoterms): who pays for what
- Door-to-door delivery
Where these facts come from
Prices and transit days are from our own rate sheet. Everything else on this page was checked against these sources in November 2026. Page by David Fan, Owner of UpFreights.
- South Carolina Ports Authority: teu history (PDF)
- Wando Welch Terminal - SC Ports Authority
- Charleston has deepest harbor on East Coast at 52 feet - SC Ports Authority
- Leatherman Terminal - SC Ports Authority
- Port of Charleston boasts quick berth access, efficient gateway to Southeast - SC Ports Authority
- SC Ports, Charleston top commodities, calendar year 2025 (PDF)
- Merchandise Processing Fee for fiscal year 2027: 0.3464%, minimum $34.58, maximum $670.86 (US Customs and Border Protection notice, summarised by Mohawk Global)
- Harbor Maintenance Fee, 0.125%: US Code of Federal Regulations, 19 CFR 24.24
- Hapag-Lloyd container specification, 40-foot standard (67.7 cubic metres)
- Sea distance worked out by UpFreights with the open-source searoute tool
- Road distances worked out by UpFreights with OpenStreetMap routing (OSRM)
FAQs
Frequently Asked Questions
How much does a container cost from Guangzhou to Charleston?
Our rate sheet has no price for Guangzhou to Charleston, so we quote it for your dates. For comparison, it shows Guangzhou to Atlanta from $4,400 for a 40-foot container, port to port. These rates are from an earlier rate sheet and are shown as a guide. Freight prices change often, so ask us for today's rate.
How far is it by sea from Guangzhou to Charleston?
About 11,030 nautical miles by the Panama Canal. We worked this out port to port with open-source routing software.
Can a container go from Guangzhou to Charleston on one ship?
Yes, on the lines that sail direct. SC Ports counts 11 weekly Asia services at Charleston. Ask us whether the sailing we quote is direct.
Can my container go inland by train from Charleston?
Yes. SC Ports is served by CSX and Norfolk Southern, and says its RapidRail service moves imports to rail within 24 hours.
How long does sea freight take from China to the United States?
Across the 10 China to the United States port pairs on our rate sheet, port-to-port transit runs from 13 to 33 days. Add time for customs and delivery.
How much does it cost to ship a 40-foot container from China to the United States?
Across those 10 port pairs, our rate sheet shows 40-foot rates from $2,700 to $4,500, port to port, before duty, tax and local charges. These rates are from an earlier rate sheet and are shown as a guide. Freight prices change often, so ask us for today's rate.
Get Your Sea Freight Quote
Ready to ship from Guangzhou to Charleston? Get a competitive quote for your cargo. Our team will respond within 24 hours.
routes
guides
response